Lag Time In Drilling | Actual & Calculations
A definite time interval is always required for pumping the samples from a particular depth to the surface where they can be collected. When determined, This critical time interval is called “Drilling lag time” and can be measured in terms of pump strokes and time. This lag applies to all downhole information, including formation cuttings …